You don't have javascript enabled. Good luck with that.
Pencarian
Turap Kali Cijantung Selesai Diperbaiki
.
photo Nurito - Beritajakarta.id

Cijantung River Retaining Wall Repaired

Cijantung River retaining wall repair at Baru Urban Village, Pasar Rebo, East Jakarta has finished. It was made from river rock to make it stronger.

It is already repaired by using river rocks. Hopefully it will be not tumbled again

Baru Urban Village Head, Ali Mansyur Siregar said, the retaining wall that located at RT 08/10 was damaged by flood on last May.

"Cijantung River retaining wall condition is still natural. Thus when heavy rain or flood comes, the materials can slide easily. We hope retaining wall along Cijantung River can be plastered by concrete or river rocks thus not tumble," he said, Tuesday (7/4).

Kali Baru Barat River Retaining Wall Repair Reaches 40 Percent

Meanwhile, Pasar Rebo Sub-district Water Resources Unit Head, Puryanto said, his side repair it by using river rock to make it stronger. Retaining wall was repaired along 30 meters. Self-managed funds was used to repair it.

"It is already repaired by using river rocks. Hopefully it will be not tumbled again," he closed.

Linked News
Popular News indeks
  1. Rano: Pancasila is the Big House for Indonesia's Diversity

    access_time02-06-2025 remove_red_eye526 personBudhi Firmansyah Surapati
  2. Friendly Countries' Ambassadors Participate in Famtrip to Seribu Islands

    access_time05-06-2025 remove_red_eye407 personAldi Geri Lumban Tobing
  3. Transjabodetabek Bogor–Blok M Route and Corridor 13 Extension Begin Operations

    access_time05-06-2025 remove_red_eye399 personDessy Suciati
  4. S. Jakarta Mayor: Idul Adha is a Moment to Enhance Compassion Among One Another

    access_time06-06-2025 remove_red_eye280 personTiyo Surya Sakti
  5. No Odd-Even Restrictions in Jakarta on June 6-9, 2025

    access_time03-06-2025 remove_red_eye274 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik