You don't have javascript enabled. Good luck with that.
Pencarian
Turap Kali Cijantung Selesai Diperbaiki
.
photo Nurito - Beritajakarta.id

Cijantung River Retaining Wall Repaired

Cijantung River retaining wall repair at Baru Urban Village, Pasar Rebo, East Jakarta has finished. It was made from river rock to make it stronger.

It is already repaired by using river rocks. Hopefully it will be not tumbled again

Baru Urban Village Head, Ali Mansyur Siregar said, the retaining wall that located at RT 08/10 was damaged by flood on last May.

"Cijantung River retaining wall condition is still natural. Thus when heavy rain or flood comes, the materials can slide easily. We hope retaining wall along Cijantung River can be plastered by concrete or river rocks thus not tumble," he said, Tuesday (7/4).

Kali Baru Barat River Retaining Wall Repair Reaches 40 Percent

Meanwhile, Pasar Rebo Sub-district Water Resources Unit Head, Puryanto said, his side repair it by using river rock to make it stronger. Retaining wall was repaired along 30 meters. Self-managed funds was used to repair it.

"It is already repaired by using river rocks. Hopefully it will be not tumbled again," he closed.

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye357 personTiyo Surya Sakti
  2. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye329 personAldi Geri Lumban Tobing
  3. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye319 personAldi Geri Lumban Tobing
  4. Smoke-Free Neighborhoods Could Be a Pilot Project for the KTR Regional Regulation Implementation

    access_time18-07-2025 remove_red_eye262 personFakhrizal Fakhri
  5. Council Encourages the Increase of RPTRAs for Child Growth and Development

    access_time18-07-2025 remove_red_eye260 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik