You don't have javascript enabled. Good luck with that.
Pencarian
Turap Kali Cijantung Selesai Diperbaiki
.
photo Nurito - Beritajakarta.id

Cijantung River Retaining Wall Repaired

Cijantung River retaining wall repair at Baru Urban Village, Pasar Rebo, East Jakarta has finished. It was made from river rock to make it stronger.

It is already repaired by using river rocks. Hopefully it will be not tumbled again

Baru Urban Village Head, Ali Mansyur Siregar said, the retaining wall that located at RT 08/10 was damaged by flood on last May.

"Cijantung River retaining wall condition is still natural. Thus when heavy rain or flood comes, the materials can slide easily. We hope retaining wall along Cijantung River can be plastered by concrete or river rocks thus not tumble," he said, Tuesday (7/4).

Kali Baru Barat River Retaining Wall Repair Reaches 40 Percent

Meanwhile, Pasar Rebo Sub-district Water Resources Unit Head, Puryanto said, his side repair it by using river rock to make it stronger. Retaining wall was repaired along 30 meters. Self-managed funds was used to repair it.

"It is already repaired by using river rocks. Hopefully it will be not tumbled again," he closed.

Linked News
Popular News indeks
  1. Most Residents Satisfied with Pramono-Rano's Performance

    access_time25-06-2025 remove_red_eye310 personDessy Suciati
  2. Pramono Ensures KJP will Continue to Be Distributed

    access_time26-06-2025 remove_red_eye306 personDessy Suciati
  3. Here are Parking Spaces around Lapangan Banteng for Jakarta's Anniversary

    access_time21-06-2025 remove_red_eye269 personAldi Geri Lumban Tobing
  4. Governor Pramono: Jakarta E-Prix 2025 in Ancol is Amazing!

    access_time21-06-2025 remove_red_eye269 personDessy Suciati
  5. No Car Free Day on June 29 to Support Jakarta International Marathon 2025

    access_time24-06-2025 remove_red_eye263 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik